28,400 SF Warehouse/Office/Conference/Event Facility
- Structural Column Relocation for Large Clear Spans
- Large Curved Soffits and Curbs for Putting Green Space
- High End Interior Bar Finishes for Putting Green Space
- Coordinate Installation of Interior Putting Green and Driving Range Simulator
- Detailed Low Voltage and Audio Visual Systems for Training Area and Golf Areas
- Reinforced and Removed Large Openings in Existing Concrete Tilt Panels
- Large Parking Lot Expansion for Required Spacing
- Installation of Elevator Shaft for Future Expansion on Exisitng Mezzanine