Skip to main content

Projects

Whirlpool FDC

Whirlpool FDC

±800,000 SF Cross-dock Factory Distribution Center

  • 7”-thick non-reinforced concrete floorslab with Ashford Densifier and caulked joints
  • 70 Dock Positions with Shelters, Fully Integrated Automatic Restraints, and 45,000# Hydraulic Levelers
  • 32’ clear in storage bays and 29’ clear in speed bays
  • 80’-deep speed bays
  • Convectional-steel framing with structural concrete tilt-up walls
  • FM 1-60 Compliant TPO Roofing
  • FM ESFR Fire Protection with exterior underground loop fed from onsite diesel fire pump
  • Heated & Ventilated warehouse with HVLS Fans for summer circulation
  • 4000-amp Electrical Service with Roll-up Generator CAMLock Box
  • 1600-amp battery charging subpanel with independent metering
  • Emergency generator with separate distribution system
  • LED Lighting with Motion Sensors
  • 150 Trailer Storage Stalls
  • Separate Guardhouse with ADA restroom
  • Hardened restroom bank to serve as severe weather shelter
  • Utilities provided to all four (4) corners for separate demising to up to four (4) tenants
  • US Army Corps 404 Permit & Stream Mitigation Offsite
  • Relocated 138kV Transmission Lines to open property for building
  • 700’ Long, 20’ Tall soil nail retaining wall holding up water treatment plant and utility substation on property line
  • 600 LF Overhead Conveyor Bridge Connecting the DC to the existing manufacturing plant to carry finished goods directly into the new facility
  • Pursuing LEED V4 Certification
  • Silver LEED Certification

Featured Projects

See All
What’s your vision?
build it with arco