The Park at 429 Building 300
Ocoee, Florida

  • 245,972 SF Speculative Distribution Warehouse
  • 32’Clear Height
  • ESFR Fire Protection System
  • 6″ Thick Reinforced Floor Slab
  • Seventy-Two (72) Dock Postions
  • 45 mil Mechanically Fastened TPO Roof with R-20 Insulation
  • Seven (7) Month Construction Schedule
  • Two (2) 14’x12′ Drive-Through Doors
  • Constructed to Accommodate Eight (8) Future Tenants