Nomax Inc. Expansion
Green Park, Missouri

UNDER CONSTRUCTION 

  • ±46,200 SF Facility Addition
  • Painted Concrete Tilt-Up Exterior with Glazing in Office Space
  • ±19,107 SF Structural Steel Framed Office Mezzanine
  • ±3,906 SF Structural Steel Framed Equipment Platform
  • ±29’-0” Clear Height in Warehouse
  • Car Parking and Truck Court Paving to Serve Expansion
  • ±5,994 SF of Modular Block Retaining Walls
  • ±8,950 SF of ISO-Classified Production Area
  • Dedicated Dust Collection System to serve Production Area
  • Complete Munters Dehumidification System to serve Production Area (RH = 10% ±5%, Temp. = ≤ 60⁰F)
  • LED Lighting Throughout
  • ESFR Fire Protection Throughout Building

NFI – Subaru of America
Florence, New Jersey

  • 1,028,000 SF BTS for Subaru of America
  • 18,000 SF Office & Employee Training Center
  • 508,000 SF Distribution Center
  • 83 Dock Positions
  • Certified LEED® Silver
  • 32’ Clear Height
  • Expandable to 1,030,050 SF

504,000 SF Expansion 

  • Dowel Baskets at all Control Joints
  • Joint Filler in all Control Joints
  • ESFR Sprinkler System
  • 189,000 SF FOR SUBARU
  • (20) Dock Positions with Levelers
  • (2) Positions with 10’ Hydraulic Levelers
  • for Sea Container Compatibility
  • (8) HVLS Fans
  • Warehouse to be Fully Racked for Storage
  • 315,000 SF Speculative Space:
  • New 2000A Service
  • (42) Dock Positions, (10) with Levelers
  • (2) Overhead Drive-In Doors

Great Lakes Cold Storage
Solon , Ohio

  • 57,300 SF Facility Expansion
  • 38,315 SF -20° Freezer
  • 12,260 SF 40° Cold Dock
  • 6,725 SF New Corporate Office
  • 12 Fully Equipped Vertical Dock Positions
  • ± 6,000 SF Added Pallet Storage Positions

Exeter-Chewy
New Kingstown, Pennsylvania

  • 176,000 Expansion to Existing Facility
  • Insulated Metal Wall Panel Facility
  • 24 Dock Positions
  • ESFR Sprinkler System

ABC Laboratories Building E
Columbia, Missouri

  • 27,000 SF Office and Laboratory Renovation
  • 10,000 SF Laboratory Addition
  • 2,000 SF Walk-In Freezer
  • 5,000 SF Sample Prep Area with Durable
  • Clean Room Finishes and Walk-In Exhaust
  • Chambers for Testing and Analysis
  • New Fire Protection, Building Management Control, and Communications Systems
  • Extensive Schedule Coordination to Allow ABC to Occupy and Continue Operations during Construction

Renovations of Existing Laboratory Include:

  • Upgrading Underwood Plumbing
  • Multiple Fume Hood Arrangements
  • Modernizing Laboratory Design
  • Building Addition Included a New Mechanical System and New Electrical System

FlightSafety International Denver Expansion
Denver, Colorado

  • 35,000 SF 2-Story Expansion to an Existing 105,000 SF
    Building Completed by ARCO in 2016
  • Expansion Will Provide Space for Two Additional Flight
    Simulators Increasing the Total to 12 for The Entire Facility,
    as Well as Additional Classrooms, Meeting Rooms, and
    Offices.
  • Tilt Concrete Construction with Traditional Steel Framed
  • Roof Structure and 2nd Floor Mezzanine.
  • 60 Mil, Fully Adhered TPO Membrane Roofing, R-24
    Insulation

 

The Fountains | Addition
Ellisville, Missouri

UNDER CONSTRUCTION

  • 95,420 SF Independent Living Addition
  • 69 Residential Units
  • Four-Story CMU and Wood Framed Construction
  • 1,375 SF New Dining Room Space and Associated Service Area Within the Courtyard of the Existing Building
  • Renovations to Existing Amenity Spaces within Existing Building
  • Brick, EIFS, and Siding Exterior Finishes

Footwear Unlimited
Fenton, Missouri

  • 26,566 SF Building Addition
  • Concrete Tilt-Up Panels
  • Two (2) High Performance
  • Cambridge Gas-Fired Make-Up
    Air Units to Heat Both New and Existing Facility
  • 20’ Clear Height
  • Six (6) New Overhead Dock Doors & Associated Equipment

Red Diamond
Moody, Alabama

  • 58,815 SF Foodservice Facility Expansion
  • 32’ Clear Height in Warehouse
  • -10°F, 28°F, 35°F, 40°F, 55°F Refrigerated Storage
  • Fluorescent Motion Sensor Lighting
  • Quell Double Interlock Pre-Action Fire Protective System for Freezers and Coolers
  • ESFR Fire Protection System for Dry Warehouse
  • 60 mil Mechanically Attached TPO Roof System
  • Insulated Tilt-Up Concrete Exterior Walls at Freezer, Cooler and Cold Dock
  • Electric Under-Floor Heating System in Freezer
  • Individual Packaged Split Freon Refrigeration Systems