Premium Waters – Riverside
Riverside, Missouri

•     165,000 SF FDA Certified Office/Production/Distribution Facility
•     28’ Clear Height
•     10,000 SF Corporate Office Area
•     Load Bearing Concrete Tilt-Up Construction
•     ESFR Sprinkler System
•     8,000 Amp 277/480 3-Phase Electrical Service
•     Twenty-Eight (28) Dock Positions
•     One (1) 14’x18’ Drive-In Door
•     Six-Inch Domestic Water Service
•     Structural Foundations for Equipment and Water Storage Silos
•     Production Mezzanine Structures/Hangers/Infrastructure Throughout

Lamborghini
St. Louis, Missouri

• 22,261 SF Luxury Dealership
• 20,000 SF Class A+ Office and Luxury Car Showroom
• 2,000 SF of Class A+ Retail
• Showroom with Marble and Granite Floors, Reception Bars
• Outdoor Promenade with Stamped and Stained Concrete
• 19’ Water Feature with Fire Effect
• Automotive Photo Booth

816 S. Kirkwood
Kirkwood, Missouri

• 24,888 SF Two Story Medical Office Building
• Brick Masonry Veneer with Split Face Block Accents and Columns
• Curtain Wall Glass/Aluminum Panel Design
• Custom Designed Aluminum Coping
• Porte-Cochère Entry Canopy for Patient
• Pick up/Drop off
• Interior Core Featuring Elevator, Wrap Staircase, Doctors’ Offices, and Exam Rooms

Kiddie Academy
O'Fallon, Missouri

• New Construction – 9,566 SF, Single Story Early Childcare Learning Facility
• State Licensed Facility (Missouri) for Infant through School Age Children
• Occupant Design for 156 Children
• Eleven (11) State-of-the-Art Classrooms
• Full Kitchen for In-House Food Preparation; Served Homestyle within Classrooms
• Integrated Security and Camera Streaming Access System
• Exterior Playground Facilities
• Dry Sprinkler Fire Protection Throughout

Jim Lynch Hummer
St. Louis, Missouri

• 35,000 SF Luxury Dealership
• 7,000 SF Showroom with 36’ Clear Ceilings and Curved Sheet Metal Composite Deck System
• 3,234 SF Class A Office
• 7,552 SF Parts Storage Area
• 15,627 SF Service Area
• 3,560 SF Mezzanine Area
• 250 Vehicle Parking Spaces
• Granite Showroom Floors
• Two Oversized High-Capacity Enclosed Car Wash Areas

Gabriel Group
Bridgeton, Missouri

• 49,700 SF Built-to-Suit
• 12,000 SF 2nd Floor Office
• Two Multi-Media Conference Rooms and Training Room
• Open, Two-Story Atrium Lobby Area with Exposed Painted Deck, Ceiling Accent Structures, Decorative Railing, and Open Staircase.
• 15,000 SF Production Area Space with 14’ Ceiling and Exposed Concrete Floors
• Five 9’ x 10’ Dock Doors and One 12’ x 14’ Drive-In Door
• ESFR Sprinkler System at Warehouse Area

Flight Safety International – St. Louis
St. Louis, Missouri

• 80,060 SF Airline Pilot Training Facility
• Equipped to House 9 Full-Flight Simulators, Supporting Classrooms, Offices, and Computer Rooms
• Three-Story Tilt-Panel Building with High Performance Visionwall Window System
• Isolated Computer and Server Rooms with Access Flooring/ Secure Data Transmission Throughout
• Fully Integrated Building Management System Including Energy Management, Lighting Control, Access Control, Video Surveillance, and Communications Equipment
• Breathable Air System/UPS System/Lost Phase Protection/Occupancy Sensor Lighting Controls 4000 AMP, 277/480V Electric Service

The Fountains of West County
Ellisville, Missouri

• 61,312 SF assisted living facility with a total of 58 Studio, one bedroom, and two bedroom units
• Four story wood and steel framed construction
• The first floor will be dedicated to support offices and amenity space with all residents units located on floors two, three, and four.
• Brick and EIFS exterior finishes
• Full service commercial kitchen
• Design/build mechanical, plumbing, fire protection, and electrical services

Celtic Apartments
St. Peters, Missouri

For Mills Properties

• 144 Unit, 10 building Apartment Complex
• 150,000 SF of unit space with 3 different unit type (1 BR, 2 BR, 3 BR)
• 7 acre site development and site improvements
• Clubhouse with development use pool and recreation area
• Breezeway layout with Hardie siding, stone, and architectural roof structure
• Design/Build consultant and preliminary cost consulting

DHL | Project Carlsbad
Fort Worth, Texas

  • 1,440,000 SF Distribution Center
  • 36’ Clear Height in Warehouse
  • ESFR Fire Protection
  • 7” Reinforced Floor Slab
  • One Hundred and Fifty (150) Dock Positions
  • 60 mil Mechanically Fastened TPO Roof with R-20 Insulation
  • Three Hundred and Fifty (350) Trailer Parking Positions
  • Guard House with Fully Enclosed Fenced Truck Courts
  • 10’ Moisture Conditioned Pad
  • Approximately 900,000 SF of Exterior 8” Reinforced Dock Paving
  • Constructed in 8 months from start of Piers to Owner Move In