FlightSafety International Denver Expansion
Denver, Colorado

UNDER CONSTRUCTION 

  • 35,000 SF 2-Story Expansion to an Existing 105,000 SF
    Building Completed by ARCO in 2016
  • Expansion Will Provide Space for Two Additional Flight
    Simulators Increasing the Total to 12 for The Entire Facility,
    as Well as Additional Classrooms, Meeting Rooms, and
    Offices.
  • Tilt Concrete Construction with Traditional Steel Framed
  • Roof Structure and 2nd Floor Mezzanine.
  • 60 Mil, Fully Adhered TPO Membrane Roofing, R-24
    Insulation

Construction Schedule is March-November 2019