Denver, CO
±35,000 SF Expansion to Existing ±105,000 SF Facility
Implementation of Two Additional Flight
Simulators, Increasing the Total to 12 for The Entire Facility
Additional Classrooms, Meeting Rooms, and
Offices.
Tilt Concrete Construction with Traditional Steel Framed
Roof Structure and 2nd Floor Mezzanine.
60 Mil, Fully Adhered TPO Membrane Roofing, R-24
Insulation