Arizona Beverages
Woodbridge , New Jersey

620,045 SF PRODUCTION AND BOTTLING FACILITY

  • Ductilcrete Floor Slab for Enhanced Floor Slab Capacity and Controlled Joints at Column Lines Only
  • Forty-Five (45) Dock Positions
  • 30,000 KVA Primary Electrical Service
  • Modular Building Units to House Boilers Associated with Steam Generation for Filling Operations
  • Modular CUB for Chilled Water and Condenser Water for Process and HVAC Cooling
  • Interior Engine Room for Blow Molding Operations, which included ARCO’s Design and Construction of all Associated Infrastructure, i.e. Electrical, Compressed Air, Chilled Water and Condenser Wat