Skip to main content

Projects

FlightSafety International Denver Expansion

35,000 SF 2-Story Expansion to an Existing 105,000 SF
Building Completed by ARCO in 2016

  • Expansion Will Provide Space for Two Additional Flight
    Simulators Increasing the Total to 12 for The Entire Facility,
    as Well as Additional Classrooms, Meeting Rooms, and
    Offices.
  • Tilt Concrete Construction with Traditional Steel Framed
  • Roof Structure and 2nd Floor Mezzanine.
  • 60 Mil, Fully Adhered TPO Membrane Roofing, R-24
    Insulation

 

Featured Projects

See All
What’s your vision?
build it with arco