619,200 SF DISTRIBUTION FACILITY TENANT IMPROVEMENT
- 26′-30′ Clear Height
- 103 New Overhead Dock Doors
- Three (3) Drive-In Doors
- 4,000 Amp Electrical Service Upgrade
- 1,500 GPM Fire Pump Installation
- New 270 SF CMU Pump House
- LED High Bays with Average Maintained 30 FC and Exterior Wall Packs
- Repave 11.5 Acres of Heavy-Duty Asphalt
- Repaint Exterior Walls and White-Box Interior Walls
- 229,595 SF Reroof with Acrylic Coating System
- Design/Build Delivery